SA 6891. Mr. JOHNSON submitted an amendment intended to be proposed by him to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Text printed in the Record (5,710 characters)
At the appropriate place, insert the following:
SEC. ___. GUIDANCE OUT OF DARKNESS ACT.
(a) Short Title.--This section may be cited as the "Guidance Out Of Darkness Act" or the "GOOD Act".
(b) Definitions.--In this section:
(1) Agency.--The term "agency" has the meaning given the term in section 551 of title 5, United States Code.
(2) Director.--The term "Director" means the Director of the Office of Management and Budget.
(3) Guidance document.--
(A) In general.--The term "guidance document"--
(i) means an agency statement of general applicability (other than a rule that has the force and effect of law that was promulgated in accordance with the notice and comment procedures under section 553 of title 5, United States Code, or a statutory exemption to such procedures) that--
(I) does not have the force and effect of law; and (II) is designated by an agency official as setting forth--
(aa) a policy on a statutory, regulatory, or technical issue; or
(bb) an interpretation of a statutory or regulatory issue;
(ii) may include--
(I) a memorandum;
(II) a notice;
(III) a bulletin;
(IV) a directive;
(V) a news release;
(VI) a letter;
(VII) a blog post;
(VIII) a no-action letter;
(IX) a speech by an agency official; and
(X) any combination of the items described in subclauses (I) through (IX); and
(iii) does not include--
(I) any information, policy, rule, or record relating to agency management or personnel; or
(II) any information, policy, rule, or record of agency organization, procedure, or practice that does not substantially affect the rights or obligations of non-agency parties.
(B) Rule of construction.--The term "guidance document"--
(i) shall be construed broadly to effectuate the purpose and intent of this section; and
(ii) shall not be limited to the items described in subparagraph (A)(ii).
(c) Publication of Guidance Documents on the Internet.--
(1) In general.--Subject to subsection (e), on the date on which an agency issues a guidance document, the agency shall publish the guidance document in accordance with the requirements under subsection (d).
(2) Previously issued guidance documents.--Subject to subsection (e), not later than 180 days after the date of enactment of this section, each agency shall publish, in accordance with the requirements under subsection (d), any guidance document issued by that agency that is in effect on that date.
(d) Single Location.--
(1) In general.--All guidance documents published under subsection (c) by an agency shall be published in a single location on an internet website designated by the Director under paragraph (5) of this subsection.
(2) Agency internet websites.--Each agency shall, for guidance documents published by the agency under subsection (c), publish a hyperlink on the principal internet website of the agency that provides access to the guidance documents at the location described in paragraph (1) of this subsection.
(3) Organization.--
(A) In general.--The guidance documents described in paragraph (1) shall be--
(i) categorized as guidance documents; and
(ii) further divided into subcategories as appropriate.
(B) Agency internet websites.--The hyperlinks described in paragraph (2) shall be prominently displayed on the principal internet website of the agency.
(4) Format of guidance documents.--Each guidance document published under subsection (c) shall be made available as an open Government data asset (as defined in section 3502 of title 44, United States Code) and, to the extent practicable, optimized for search engines.
(5) Designation.--Not later than 90 days after the date of enactment of this section, the Director shall designate an internet website on which guidance documents shall be published under subsection (c).
(e) Documents and Information Exempt From Disclosure Under FOIA.--If a guidance document issued by an agency is a document that is exempt from disclosure under section 552(b) of title 5, United States Code (commonly known as the "Freedom of Information Act"), or contains information that is exempt from disclosure under such section 552(b), that document or information, as the case may be, shall not be subject to the requirements under this section.
(f) Rescinded Guidance Documents.--On the date on which a guidance document issued by an agency is rescinded, or, in the case of a guidance document that is rescinded pursuant to a court order, not later than the date on which the order is entered, the agency shall, at the location described in subsection (d)(1)--
(1) maintain the rescinded guidance document; and
(2) indicate--
(A) that the guidance document is rescinded;
(B) if the guidance document was rescinded pursuant to a court order, the case number of the case in which the order was entered; and
(C) the date on which the guidance document was rescinded.
(g) Rules of Construction.--
(1) Validity of guidance documents.--Nothing in this section shall be construed to mean that noncompliance with any provision of this section affects or otherwise impacts the validity of any guidance document.
(2) Congressional review of guidance documents.--Nothing in this section shall be construed to affect or otherwise impact whether a guidance document is subject to congressional review under chapter 8 of title 5, United States Code.
(h) Report on Agency Compliance.--Not later than 5 years after the date of enactment of this section, the Comptroller General shall submit to the Committee on Oversight and Government Reform of the House of Representatives and the Committee on Homeland Security and Governmental Affairs of the Senate a report on the compliance of agencies with this section.
______
SA 6892. Mr. KENNEDY (for himself and Mr. Cassidy) submitted an amendment intended to be proposed by him to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Text printed in the Record (613 characters)
At the appropriate place, insert the following:
SEC. ___. DEFINITION OF THE TERM "COASTAL POLITICAL
SUBDIVISION" UNDER THE GULF OF MEXICO ENERGY
SECURITY ACT OF 2006.
Section 102(10)(A) of the Gulf of Mexico Energy Security Act of 2006 (43 U.S.C. 1331 note; Public Law 109-432) is amended by striking "as of the date of enactment of this Act" and inserting ", as delineated on the date of enactment of the Bipartisan American Affordability and Jobs Act of 2026 in the management program of the Gulf producing State approved by the Secretary of Commerce under section 306 of that Act (16 U.S.C. 1455)".
______
SA 6893. Ms. SMITH (for herself and Ms. Klobuchar) submitted an amendment intended to be proposed by her to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Text printed in the Record (908 characters)
On page 242, strike lines 3 through 10 and insert the following:
(d) Rights-of-Way.--Section 216(e) of the Federal Power Act (16 U.S.C. 824p(e)) is amended--
(1) in paragraph (1), by striking "or a State";
(2) in paragraph (3), by striking "shall conform" and all that follows through the period at the end and inserting "shall be in accordance with rule 71.1 of the Federal Rules of Civil Procedure."; and
(3) by adding at the end the following:
"(5) Any proceeding under this subsection shall be subject to all applicable landowner protections afforded by the State in which the applicable affected property is located, and nothing in this section overrides or otherwise affects any protection, including any substantive or procedural right, requirement, or other protection, available or otherwise applicable to an affected landowner under State law before, during, or after the proceeding.".
______
SA 6894. Ms. SMITH submitted an amendment intended to be proposed by her to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Text printed in the Record (203 characters)
On page 239, lines 3 through 5, strike "the application was filed with the State commission or other entity" and insert "the State commission or other entity determines that the application is complete".
SA 6895. Mrs. SHAHEEN submitted an amendment intended to be proposed by her to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Text printed in the Record (11,997 characters)
Beginning on page 110, strike line 1 and all that follows through page 133, line 3, and insert the following:
SEC. 1202. CLEAN WATER ACT PERMITTING AND STATE
CERTIFICATION.
Section 401 of the Federal Water Pollution Control Act (33 U.S.C. 1341) is amended by adding at the end the following:
"(e) Certification Procedures, Requirements, and Limitations.--
"(1) Effect of certain certification actions.--
"(A) Certification or waiver.--If a certifying authority grants a certification application or if a certifying authority waives the certification requirement for a certification application, the agency with jurisdiction over the Federal license or permit for which the certification application was made shall consider water quality requirements satisfied for the purpose of considering the application for the Federal license or permit.
"(B) Certification with conditions.--If a certifying authority grants a certification application with conditions, the agency with jurisdiction over the Federal license or permit for which the certification application was made shall consider water quality requirements satisfied for the purpose of considering the application for the Federal license or permit, subject to the conditions included in the certification.
"(2) Scope of certification.--
"(A) In general.--The scope of a certification provided under this section shall be limited to water quality.
"(B) Savings provision.--Nothing in this paragraph allows a Federal licensing or permitting agency to refuse to include conditions from a certifying authority in a Federal license or permit if the certifying authority determines the conditions are necessary to ensure compliance with water quality requirements.
"(3) Required procedures.--
"(A) Notice and hearings.--Taking into account State or Tribal law, as appropriate, and the review period described in paragraph (4), each certifying authority shall establish procedures for--
"(i) public notice in the case of all certification applications;
"(ii) to the extent the certifying authority determines to be appropriate, public hearings in connection with specific certification applications; and
"(iii) a prefiling meeting as described in subparagraph (B).
"(B) Prefiling meeting.--
"(i) Request.--Before submitting a certification application, the prospective applicant may request a prefiling meeting with the certifying authority--
"(I) to ensure that the certifying authority receives early notification of projects for which a certification under subsection (a) is necessary; and
"(II) to discuss informational needs with the certifying authority before submitting the application.
"(ii) Response required.--If a prospective applicant requests a prefiling meeting with a
certifying authority pursuant to clause (i), the certifying authority shall--
"(I) respond to the request not later than 30 days after the date on which the request is received; and
"(II) hold the prefiling meeting with the prospective applicant not later than 60 days after the date on which the request is received.
"(C) Certification applications.--
"(i) Application in writing.--A certification application shall be made in writing to the applicable certifying authority.
"(ii) Requirements for complete application.--A complete certification application shall consist of the following:
"(I) Identification of each applicant for the Federal license or permit with respect to which the certification application is made.
"(II) A statement that information included in the certification application is truthful, accurate, and complete, to the best knowledge of each such applicant.
"(III) In the case of a certification application with respect to an individual permit or license--
"(aa) identification of the Federal license or permit that is the subject of the certification application with respect to which the certification is requested;
"(bb) identification of any activity the conduct of which is subject to the Federal license or permit;
"(cc) identification of the location and nature of any discharge that may result from the activity, and the location of the receiving waters;
"(dd) a description of means that may be used to monitor, control, or manage any such discharge; and
"(ee) a list of all other Federal, interstate, Tribal, State, or local agency authorizations related to the requirement for a certification under subsection (a), and any approval or denial of such an authorization already received.
"(IV) Any additional materials required by the applicable certifying authority pursuant to clause (iii), subject to the condition that the additional materials shall only be required with respect to certification applications submitted after the date on which the regulation described in that clause has been promulgated.
"(iii) Additional materials.--
"(I) In general.--A certifying authority may promulgate regulations establishing materials to be required in completed certification applications in addition to the materials described in subclauses (I) through (III) of clause (ii) that the certifying authority determines are necessary to demonstrate to the certifying authority compliance with water quality requirements.
"(II) Requirement.--In promulgating regulations under subclause (I), a certifying authority shall only base the determination regarding what additional materials are needed on what can reasonably be expected of an applicant at the time at which a certification application is submitted.
"(III) Effect of failure to promulgate.--Beginning on or after December 31, 2027, if a certifying authority fails to promulgate regulations under subclause (I), a certification application to that certifying authority shall be considered complete if the certification application includes all of the items described in subclauses (I) through (III) of clause (ii).
"(IV) Transition.--Prior to December 31, 2027, a certifying authority may require materials beyond the materials described in subclauses (I) through (III) of clause (ii) without promulgating regulations under subclause (I) through a single written notice applicable to all applicants submitting certification applications if the certifying authority determines that those additional materials are necessary to demonstrate to the certifying authority compliance with water quality requirements and the additional materials are those that can be reasonably expected of an applicant at the time at which a certification application is submitted.
"(iv) Acknowledgment of receipt.--Not later than 3 days after the date on which an applicant submits to a certifying authority a certification application for an individual Federal license or permit, the certifying authority shall acknowledge receipt of the certification application in writing.
"(v) Notification of complete application or identification of missing materials.--Not later than 90 days after the date on which a certifying authority acknowledges receipt of a certification application under clause (iv), the certifying authority shall--
"(I) provide the applicant a written notification that the certification application is complete; or
"(II) identify to the applicant in writing all specific additional materials or information described in clauses (ii) and, if applicable, (iii) necessary for the certification application to be considered complete, including, for each such additional piece of material or information, a description of the water quality requirement for which the additional material or information is needed in order to evaluate compliance with that water quality requirement.
"(vi) Petition to court.--
"(I) Right to petition.--An applicant may petition for judicial review of an alleged failure by a certifying authority to act in accordance with clauses (ii) through (v) by filing a written petition in a court of competent jurisdiction.
"(II) Considerations.--In reviewing a petition under this subclause, a reviewing court shall consider--
"(aa) the administrative record, which shall consist of the materials required to be submitted under clause (ii);
"(bb) any materials or information identified by certifying authority as missing pursuant to a notification under clause (v)(II);
"(cc) the information submitted by the applicant to the certifying authority; and
"(dd) any evidence presented to the court by the applicant that suggests that the defense of the certifying authority to the petition is pretextual.
"(III) Court order.--If a court, in reviewing a petition under this clause, finds that a certifying authority has failed to act in accordance with any of clauses (ii), (iv), and (v), the court shall provide injunctive relief, as appropriate, to give effect to this section.
"(D) Denials of certification for individual license or permit.--If a certifying authority denies a certification application for an individual license or permit, the certifying authority shall provide to the applicant and the applicable Federal licensing or permitting agency--
"(i) the specific water quality requirements that the certifying authority determined will be violated if certification were granted;
"(ii) a statement explaining why the certifying authority determined the identified water quality requirements will be violated; and
"(iii) if the denial is due to insufficient information, a description of the specific water quality data or information, if any, that would be needed to evaluate whether granting certification will comply with water quality requirements.
"(4) Review period.--
"(A) In general.--Subject to subparagraph (C) and in consultation with each certifying authority, a licensing or permitting agency shall, categorically or on a case-by-case basis for each certification application, establish a reasonable period of time (not to exceed 1 year from the date of receipt of the certification application) within which a certifying authority shall issue a final action on the certification application, which shall account for time required under applicable State or Tribal law for public notice and comment periods, if any.
"(B) Failure to act.--If a certifying authority fails or refuses to issue a final action as described in paragraph (6) on a certification application by the end of the reasonable period of time established under subparagraph (A) and the reasonable period of time has not been extended in accordance with subparagraph (C), the requirement for a certification under subsection (a) shall be waived, except that the reasonable period of time shall restart in the event that the certification application is voluntarily withdrawn by the applicant and the applicant submits a new certification application.
"(C) Requirement for extension.--With respect to a certification application, the reasonable period of time established under subparagraph (A) may only be extended if--
"(i) the extension is requested, in writing, by the applicant; and
"(ii) the certifying authority concurs, in writing, with the extension.
"(5) Waiver of certification requirement.--
"(A) In general.--A certifying authority may, at any time during the reasonable period of time described in paragraph (4), affirmatively waive the requirement for a certification under subsection (a).
"(B) No judicial review.--Notwithstanding any other provision of Federal law, including any provision of this section, a waiver of the requirement for a certification under this section shall not be subject to judicial review.
"(6) Final action.--Not later than the date on which the reasonable period of time established under paragraph (4) for a certification application ends or on the date of a waiver pursuant to paragraph (5)(A), as applicable, the certifying authority shall apply only 1 of the following final actions to the certification application:
"(A) The certification application is granted.
"(B) The certification application is granted with conditions.
"(C) The certification application is
Text printed in the Record (7,816 characters)
denied.
"(D) The certification requirements under subsection (a) have been waived in accordance with paragraph (4) or (5) with respect to the certification application.
"(f) Special Rule for Certain Certifications.--
"(1) Definition of interstate transmission line project.--In this subsection, the term `interstate transmission line project' means a project for the construction, modification, or upgrade of a transmission facility that is part of the bulk-power system (as defined in section 215(a) of the Federal Power Act (16 U.S.C. 824o(a))).
"(2) Limitation on certification requirements for certain interstate linear infrastructure.--Notwithstanding the first sentence of subsection (a)(1), any applicant for a certificate of public convenience and necessity for a project under section 7 of the Natural Gas Act (15 U.S.C. 717f) or a Federal authorization or permit required to construct, modify, or operate an interstate transmission line project that may result in a discharge into the waters of the United States shall provide to the Federal licensing or permitting agency a certification from a certifying authority that such discharge
complies with water quality requirements or a waiver pursuant to this section.
"(3) Certification of no limitation and standard.--In the case of any discharge described in this subsection for which there is not an applicable effluent limitation or other limitation under sections 301(b) and 302 and for which there is not an applicable standard under sections 306 and 307, the certifying authority shall so certify, except that such a certification shall not satisfy section 511(c).
"(4) Review for compliance.--Notwithstanding subsection (a)(4)--
"(A) prior to the initial operation of any federally licensed or permitted facility or activity that may result in a discharge into the waters of the United States and with respect to which a certification has been obtained pursuant to this subsection, which facility or activity is not subject to a Federal operating license or permit, the licensee or permittee shall provide an opportunity for the certifying authority to review the manner in which the facility or activity shall be operated or conducted for the purposes of assuring that applicable effluent limitations or other limitations or other applicable water quality requirements will not be violated;
"(B) on notification by the certifying authority that the operation of any federally licensed or permitted facility or activity described in subparagraph (A) will violate applicable effluent limitations or other limitations or other water quality requirements, the applicable Federal agency may, after public hearing, suspend the Federal license or permit; and
"(C) if a Federal license or permit is suspended pursuant to subparagraph (B), the Federal license or permit shall remain suspended until notification is received from the certifying authority that there is reasonable assurance that the facility or activity will not violate the applicable provisions of sections 301, 302, 303, 306, and 307.
"(5) Limitation and monitoring requirements of certain linear infrastructure certifications.--Notwithstanding subsection (d)--
"(A) any certification provided under this subsection shall set forth any effluent limitations and other limitations and monitoring requirements necessary to assure that any discharge subject to this subsection will comply with the applicable provisions of sections 301, 302, 303, 306, and 307; and
"(B) any limitations and requirements set forth pursuant to subparagraph (A) shall be imposed by the licensing or permitting agency as a condition on any Federal license or permit subject to the provisions of this section.
"(6) Reasonable period of time.--Notwithstanding the periods of time in subsections (a)(1) and (e)(4), a licensing or permitting agency shall, categorically or on a case-by-case basis for each certification application, establish a reasonable period of time (not to exceed 9 months from the date of receipt of the certification application) within which a certifying authority shall issue a final action on the certification application under this subsection, which shall account for the time required under applicable State or Tribal law for public notice and comment periods.
"(g) Definitions.--In this section:
"(1) Certification application.--The term `certification application' means a request from an applicant for a certification described in subsection (a).
"(2) Certifying authority.--The term `certifying authority', with respect to a certification application, means, as applicable--
"(A) the State or interstate agency to which the certification application was submitted, including an Indian Tribe that is treated as a State for purposes of this section pursuant to section 131.8 of title 40, Code of Federal Regulations; or
"(B) if no State or interstate agency has the authority to provide the certification described in subsection (a), the Administrator.
"(3) Water quality requirements.--The term `water quality requirements' means--
"(A) the applicable provisions of sections 301, 302, 303, 306, and 307; and
"(B) any Federal and State or Tribal laws (including regulations) implementing sections 301, 302, 303, 306, and 307 that are applicable to discharges into waters of the United States, and any other water quality-related requirement of State or Tribal law.".
SEC. 1203. PERMIT TERM FOR NPDES PERMITS.
Section 402(b)(1)(B) of the Federal Water Pollution Control Act (33 U.S.C. 1342(b)(1)(B)) is amended by striking "five years" and inserting "10 years".
SEC. 1204. PERMITS FOR DREDGED OR FILL MATERIAL.
(a) Reducing Permitting Uncertainty.--
(1) In general.--Section 404(c) of the Federal Water Pollution Control Act (33 U.S.C. 1344(c)) is amended--
(A) by striking "(c) The Administrator" and inserting the following:
"(c) Specification or Use of Defined Area.--
"(1) In general.--The Administrator";
(B) in paragraph (1) (as so designated), by inserting "during the period described in paragraph (2) and" before "after notice and opportunity for public hearings"; and
(C) by adding at the end the following:
"(2) Period of prohibition.--The Administrator may act pursuant to paragraph (1) only during the period that--
"(A) begins on the date on which an applicant submits a complete application under this section; and
"(B) ends on the date on which the Secretary issues the permit.".
(2) Applicability.--The amendments made by paragraph (1) shall apply to a permit application submitted under section 404 of the Federal Water Pollution Control Act (33 U.S.C. 1344) after the date of enactment of this Act.
(b) Nationwide Permitting Improvement.--Section 404(e) of the Federal Water Pollution Control Act (33 U.S.C. 1344(e)) is amended--
(1) by striking "(e)(1) In carrying" and inserting the following:
"(e) General Permits on State, Regional, or Nationwide Basis.--
"(1) Permits authorized.--In carrying";
(2) in paragraph (2)--
(A) by striking "(2) No general" and inserting the following:
"(2) Term.--
"(A) In general.--No general";
(B) in subparagraph (A) (as so designated), by striking "five years" and inserting "10 years"; and
(C) by adding at the end the following:
"(B) Timing of modification.--The Secretary may modify a general permit pursuant to subparagraph (A) during the term of the general permit or during the renewal of the general permit."; and
(3) by adding at the end the following:
"(3) Considerations.--In determining the environmental effects of an activity under paragraph (1) or (2), the Secretary--
"(A) shall consider only the effects on compliance with water quality requirements (as defined in section 401(g)) of any discharge of dredged or fill material resulting from the activity; and
______
SA 6896. Ms. ALSOBROOKS (for herself, Mr. Schiff, Mr. Padilla, Mrs. Gillibrand, Mr. Kim, Ms. Duckworth, Mr. Merkley, Mr. Lujan, Ms. Blunt Rochester, Mr. Blumenthal, Ms. Smith, and Ms. Cantwell) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Text printed in the Record (11,996 characters)
Beginning on page 111, strike line 8 and all that follows through page 130, line 15, and insert the following:
"(2) Scope of certification.--
"(A) In general.--The scope of a certification provided under this section shall be limited to ensuring that any applicant for a Federal license or permit will comply with water quality requirements with respect to the activity as a whole, including any discharge that may result from the activity.
"(B) Prohibition.--In reviewing a certification application, no certifying authority may--
"(i) deny certification for any reason other than making a determination that--
"(I) no modification to or reasonable condition on the certification would make it possible to grant the certification without violating water quality requirements; or
"(II) after the certifying authority has sent the communication described in clause (v)(II) of paragraph (3)(C) and given the applicant a reasonable opportunity to provide the additional materials or information described in that communication, the application continues to lack--
"(aa) the information required under clause (ii) and, if applicable, clause (iii) of that paragraph; or
"(bb) information needed to evaluate compliance with water quality requirements, as described pursuant to paragraph (3)(D)(iii); or
"(ii) grant certification with conditions, except for conditions that the certifying authority determines are necessary to ensure compliance with water quality requirements.
"(C) Savings provision.--Nothing in this paragraph allows a Federal licensing or permitting agency to refuse to include conditions from a certifying authority in a Federal license or permit if the certifying authority determines the conditions are necessary to ensure compliance with water quality requirements, including conditions applicable to the activity as a whole.
"(D) Rule of construction.--Except as provided in subsection (g), nothing in this section limits the authority of a certifying authority under subsection (d) to establish limitations, conditions, and monitoring requirements applicable to the activity as a whole, rather than solely to the discharge that gives rise to the requirement for certification under subsection (a), if the limitations, conditions, or requirements are necessary to ensure compliance with water quality requirements.
"(3) Required procedures.--
"(A) Notice and hearings.--Taking into account State or Tribal law, as appropriate, and the review period described in paragraph (4), each certifying authority shall establish procedures for--
"(i) public notice in the case of all certification applications;
"(ii) to the extent the certifying authority determines to be appropriate, public hearings in connection with specific certification applications; and
"(iii) a prefiling meeting as described in subparagraph (B).
"(B) Prefiling meeting.--
"(i) Request.--Before submitting a certification application, the prospective applicant may request a prefiling meeting with the certifying authority--
"(I) to ensure that the certifying authority receives early notification of projects for which a certification under subsection (a) is necessary; and
"(II) to discuss informational needs with the certifying authority before submitting the application.
"(ii) Response required.--If a prospective applicant requests a prefiling meeting with a certifying authority pursuant to clause (i), the certifying authority shall--
"(I) respond to the request not later than 30 days after the date on which the request is received; and
"(II) hold the prefiling meeting with the prospective applicant not later than 60 days after the date on which the request is received.
"(C) Certification applications.--
"(i) Application in writing.--A certification application shall be made in writing to the applicable certifying authority.
"(ii) Requirements for complete application.--A complete certification application shall consist of the following:
"(I) Identification of each applicant for the Federal license or permit with respect to which the certification application is made.
"(II) A statement that information included in the certification application is truthful, accurate, and complete, to the best knowledge of each such applicant.
"(III) In the case of a certification application with respect to an individual permit or license--
"(aa) identification of the Federal license or permit that is the subject of the certification application with respect to which the certification is requested;
"(bb) identification of any activity the conduct of which is subject to the Federal license or permit;
"(cc) identification of the location and nature of any discharge that may result from the activity, and the location of the receiving waters;
"(dd) a description of means that may be used to monitor, control, or manage any such discharge; and
"(ee) a list of all other Federal, interstate, Tribal, State, or local agency authorizations related to the requirement for a certification under subsection (a), and any approval or denial of such an authorization already received.
"(IV) Any additional materials required by the applicable certifying authority pursuant to clause (iii), subject to the condition that the additional materials shall only be required with respect to certification applications submitted after the date on which the regulation described in that clause has been promulgated.
"(iii) Additional materials.--
"(I) In general.--A certifying authority may promulgate regulations establishing materials to be required in completed certification applications in addition to the materials described in subclauses (I) through (III) of clause (ii) that the certifying authority determines are necessary to demonstrate to the certifying authority compliance with water quality requirements.
"(II) Requirement.--In promulgating regulations under subclause (I), a certifying authority shall only base the determination regarding what additional materials are needed on what can reasonably be expected of an applicant at the time at which a certification application is submitted.
"(III) Effect of failure to promulgate.--Beginning on or after December 31, 2027, if a certifying authority fails to promulgate regulations under subclause (I), a certification application to that certifying authority shall be considered complete if the certification application includes all of the items described in subclauses (I) through (III) of clause (ii).
"(IV) Transition.--Prior to December 31, 2027, a certifying authority may require materials beyond the materials described in subclauses (I) through (III) of clause (ii) without promulgating regulations under subclause (I) through a single written notice applicable to all applicants submitting certification applications if the certifying authority determines that those additional materials are necessary to demonstrate to the certifying authority compliance with water quality requirements and the additional materials are those that can be reasonably expected of an applicant at the time at which a certification application is submitted.
"(iv) Acknowledgment of receipt.--Not later than 3 days after the date on which an applicant submits to a certifying authority a certification application for an individual Federal license or permit, the certifying authority shall acknowledge receipt of the certification application in writing.
"(v) Notification of complete application or identification of missing materials.--Not later than 90 days after the date on which a certifying authority acknowledges receipt of a certification application under clause (iv), the certifying authority shall--
"(I) provide the applicant a written notification that the certification application is complete; or
"(II) identify to the applicant in writing all specific additional materials or information described in clauses (ii) and, if applicable, (iii) necessary for the certification application to be considered complete, including, for each such additional piece of material or information, a description of the water quality requirement for which the additional material or information is needed in order to evaluate compliance with that water quality requirement.
"(vi) Petition to court.--
"(I) Right to petition.--An applicant may petition for judicial review of an alleged failure by a certifying authority to act in accordance with clauses (ii) through (v) by filing a written petition in a court of competent jurisdiction.
"(II) Considerations.--In reviewing a petition under this subclause, a reviewing court shall consider--
"(aa) the administrative record, which shall consist of the materials required to be submitted under clause (ii);
"(bb) any materials or information identified by certifying authority as missing pursuant to a notification under clause (v)(II);
"(cc) the information submitted by the applicant to the certifying authority; and
"(dd) any evidence presented to the court by the applicant that suggests that the defense of the certifying authority to the petition is pretextual.
"(III) Court order.--If a court, in reviewing a petition under this clause, finds that a certifying authority has failed to act in accordance with any of clauses (ii), (iv), and (v), the court shall provide injunctive relief, as appropriate, to give effect to this section.
"(D) Denials of certification for individual license or permit.--If a certifying authority denies a certification application for an individual license or permit, the certifying authority shall provide to the applicant and the applicable Federal licensing or permitting agency--
"(i) the specific water quality requirements that the certifying authority determined will be violated if certification were granted;
"(ii) a statement explaining why the certifying authority determined the identified water quality requirements will be violated; and
"(iii) if the denial is due to insufficient information, a description of the specific water quality data or information, if any, that would be needed to evaluate whether granting certification will comply with water quality requirements.
"(4) Review period.--
"(A) In general.--Subject to subparagraph (C) and in consultation with each certifying authority, a licensing or permitting agency shall, categorically or on a case-by-case basis for each certification application, establish a reasonable period of time (not to exceed 1 year from the date of receipt of the certification application) within which a certifying authority shall issue a final action on the certification application, which shall account for time required under applicable State or Tribal law for public notice and comment periods, if any.
"(B) Failure to act.--If a certifying authority fails or refuses to issue a final action as described in paragraph (6) on a certification application by the end of the reasonable period of time established under subparagraph (A) and the reasonable period of time has not been extended in accordance with subparagraph (C), the requirement for a certification under subsection (a) shall be waived, except that the reasonable period of time shall restart in the event that the certification application is voluntarily withdrawn by the applicant and the applicant submits a new certification application.
"(C) Requirement for extension.--With respect to a certification application, the reasonable period of time established under subparagraph (A) may only be extended if--
"(i) the extension is requested, in writing, by the applicant; and
"(ii) the certifying authority concurs, in writing, with the extension.
"(5) Waiver of certification requirement.--
"(A) In general.--A certifying authority may, at any time during the reasonable period of time described in paragraph (4), affirmatively waive the requirement for a certification under subsection (a).
"(B) No judicial review.--Notwithstanding any other provision of Federal law, including any
Text printed in the Record (7,509 characters)
provision of this section, a waiver of the requirement for a certification under this section shall not be subject to judicial review.
"(6) Final action.--Not later than the date on which the reasonable period of time established under paragraph (4) for a certification application ends or on the date of a waiver pursuant to paragraph (5)(A), as applicable, the certifying authority shall apply only 1 of the following final actions to the certification application:
"(A) The certification application is granted.
"(B) The certification application is granted with conditions.
"(C) The certification application is denied.
"(D) The certification requirements under subsection (a) have been waived in accordance with paragraph (4) or (5) with respect to the certification application.
"(f) Judicial Review.--
"(1) Burdens of proof.--When reviewing a denial of a certification under this section, a court shall place the burden of proof on the certifying authority to demonstrate that--
"(A) no reasonable modifications to or reasonable conditions on the certification would
make it possible to grant the certification without violating water quality requirements; or
"(B) the applicant has not provided information sufficient to evaluate compliance with water quality requirements, as described pursuant to subsection (e)(3)(D)(iii).
"(2) Conditions.--When reviewing a challenge to 1 or more conditions required by a certifying authority under this section, a court shall place the burden of proof on the certifying authority to demonstrate that the 1 or more challenged conditions are necessary to allow the certification to be made without violating water quality requirements.
"(3) Scope of conditions.--A court reviewing a condition required by a certifying authority under this section may not set aside the condition on the basis that the condition applies to the activity as a whole, or to effects of the activity other than the discharge, if the condition is necessary to ensure compliance with water quality requirements.
"(g) Special Rule for Certain Certifications.--
"(1) Definition of interstate transmission line project.--In this subsection, the term `interstate transmission line project' means a project for the construction, modification, or upgrade of a transmission facility that is part of the bulk-power system (as defined in section 215(a) of the Federal Power Act (16 U.S.C. 824o(a))).
"(2) Limitation on certification requirements for certain interstate linear infrastructure.--Notwithstanding the first sentence of subsection (a)(1), any applicant for a certificate of public convenience and necessity for a project under section 7 of the Natural Gas Act (15 U.S.C. 717f) or a Federal authorization or permit required to construct, modify, or operate an interstate transmission line project that may result in a direct point source discharge into the waters of the United States shall provide to the Federal licensing or permitting agency a certification from a certifying authority that such direct point source discharge complies with water quality requirements or a waiver pursuant to this section.
"(3) Certification of no limitation and standard.--In the case of any direct point source discharge described in this subsection for which there is not an applicable effluent limitation or other limitation under sections 301(b) and 302 and for which there is not an applicable standard under sections 306 and 307, the certifying authority shall so certify, except that such a certification shall not satisfy section 511(c).
"(4) Review for compliance.--Notwithstanding subsection (a)(4)--
"(A) prior to the initial operation of any federally licensed or permitted facility or activity that may result in a direct point source discharge into the waters of the United States and with respect to which a certification has been obtained pursuant to this subsection, which facility or activity is not subject to a Federal operating license or permit, the licensee or permittee shall provide an opportunity for the certifying authority to review the manner in which the facility or activity shall be operated or conducted for the purposes of assuring that applicable effluent limitations or other limitations or other applicable water quality requirements will not be violated;
"(B) on notification by the certifying authority that the operation of any federally licensed or permitted facility or activity described in subparagraph (A) will violate applicable effluent limitations or other limitations or other water quality requirements, the applicable Federal agency may, after public hearing, suspend the Federal license or permit; and
"(C) if a Federal license or permit is suspended pursuant to subparagraph (B), the Federal license or permit shall remain suspended until notification is received from the certifying authority that there is reasonable assurance that the facility or activity will not violate the applicable provisions of sections 301, 302, 303, 306, and 307.
"(5) Limitation and monitoring requirements of certain linear infrastructure certifications.--Notwithstanding subsection (d)--
"(A) any certification provided under this subsection shall set forth any effluent limitations and other limitations and monitoring requirements necessary to assure that any direct point source discharge subject to this subsection will comply with the applicable provisions of sections 301, 302, 303, 306, and 307; and
"(B) any limitations and requirements set forth pursuant to subparagraph (A) shall be imposed by the licensing or permitting agency as a condition on any Federal license or permit subject to the provisions of this section.
"(6) Reasonable period of time.--Notwithstanding the periods of time in subsections (a)(1) and (e)(4), a licensing or permitting agency shall, categorically or on a case-by-case basis for each certification application, establish a reasonable period of time (not to exceed 9 months from the date of receipt of the certification application) within which a certifying authority shall issue a final action on the certification application under this subsection, which shall account for the time required under applicable State or Tribal law for public notice and comment periods.
"(h) Definitions.--In this section:
"(1) Certification application.--The term `certification application' means a request from an applicant for a certification described in subsection (a).
"(2) Certifying authority.--The term `certifying authority', with respect to a certification application, means, as applicable--
"(A) the State or interstate agency to which the certification application was submitted, including an Indian Tribe that is treated as a State for purposes of this section pursuant to section 131.8 of title 40, Code of Federal Regulations; or
"(B) if no State or interstate agency has the authority to provide the certification described in subsection (a), the Administrator.
"(3) Water quality requirements.--The term `water quality requirements' means--
"(A) the applicable provisions of sections 301, 302, 303, 306, and 307; and
"(B) any Federal and State or Tribal laws (including regulations) implementing sections 301, 302, 303, 306, and 307, including water quality standards adopted or promulgated under section 303 that include designated uses, water quality criteria, and antidegradation requirements, each of which may be independently enforced through a certification under this section.".
______
SA 6897. Ms. ALSOBROOKS (for herself, Ms. Duckworth, Mr. Merkley, Mr. Lujan, Ms. Blunt Rochester, Mr. Blumenthal, Mr. Bennet, Mr. Kim, and Mr. Kelly) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Text printed in the Record (4,026 characters)
Beginning on page 74 of the amendment, strike line 20 and all that follows through page 76, line 14, and insert the following:
"(5) Remedy.--
"(A) In general.--Except as provided in subparagraphs (B) and (D) and notwithstanding any other provision of law, if, after review on the merits of a claim, a court determines that the environmental review for an authorization was not conducted in accordance with the requirements of this Act, the only remedy the court may order to redress that violation is to remand, without vacatur or issuance of an injunction, the applicable authorization to the agency with--
"(i) specific instructions to correct errors or deficiencies found by the court; and
"(ii) a reasonable schedule and deadline, which shall be enforced by the court, for the agency to act on remand, which shall not exceed 180 days after the date on which the order of the court was entered, except that the court may extend the deadline once, by not more than 90 days, for good cause shown.
"(B) Injunctions pending remand.--
"(i) In general.--Notwithstanding subparagraph (A) and subject to clause (ii), if a court makes a determination under subparagraph (A), the court may enjoin the applicable authorization, or the activity that is the subject of the authorization, until the agency completes the actions required on remand, if--
"(I) the court finds that--
"(aa) the authorization or the activity that is the subject of the authorization will cause a reasonably foreseeable adverse environmental effect or preclude the consideration of reasonable alternatives; or
"(bb) the agency failed to prepare an environmental document required under this Act for the proposed agency action that the authorization implements;
"(II) the plaintiff will suffer irreparable harm in the absence of an injunction;
"(III) the balance of equities favors the plaintiff; and
"(IV) an injunction is in the public interest.
"(ii) Duration of injunction.--An injunction issued by a court under clause (i) shall last no longer than the time the court finds is reasonably necessary--
"(I) for the completion of any environmental review required under this Act; and
"(II) to prevent the irreparable harm described in clause (i)(II).
"(iii) Scope of injunction.--
"(I) In general.--Except as provided in subclause (II), an injunction issued by a court under clause (i) shall be limited to the portion of the agency action that has not been adequately addressed through an environmental review under this Act.
"(II) Exception.--If a portion of an agency action described in subclause (I) is not severable from the action as a whole, a court may enjoin such agency action in its entirety.
"(iv) Irreparable harm.--A finding by a court under subclause (I)(aa) of clause (i) shall satisfy the requirement under subclause (II) of that clause.
"(C) Violations of other law.--
"(i) In general.--Subparagraph (A) and paragraph (6) shall apply only to a violation of the requirements of this Act.
"(ii) Limitation.--Nothing in subparagraph (A) or paragraph (6) limits the remedies available under any other Federal law for a violation of that Federal law that a court finds with respect to a claim within its jurisdiction under paragraph (2).
"(D) Failure to act on remand or inadequate remand.--If an agency does not complete the actions required on remand by the deadline established under subparagraph (A)(ii), including any extension, or if the court finds that the actions taken on remand do not correct the errors or deficiencies found by the court--
"(i) paragraph (6) shall cease to apply to the authorization;
"(ii) on motion of any party, the court may grant such other relief as the court determines appropriate, until the agency completes the actions required on remand;
"(iii) the court shall retain jurisdiction to ensure compliance with its order; and
"(iv) if the court finds that the failure was willful, the court may award reasonable attorney fees and costs to the party that obtained the remand.
______
SA 6898. Ms. BLUNT ROCHESTER submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Text printed in the Record (93 characters)
On page 17, line 17, insert ", including mortgage insurance," after "loan guarantee".
______
SA 6899. Ms. BLUNT ROCHESTER submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Text printed in the Record (4,799 characters)
Beginning on page 126, strike line 14 and all that follows through page 130, line 15, and insert the following: mission line project that may result in a point source discharge into the waters of the United States shall provide to the Federal licensing or permitting agency a certification from a certifying authority that such point source discharge complies with water quality requirements or a waiver pursuant to this section.
"(3) Certification of no limitation and standard.--In the case of any point source discharge described in this subsection for which there is not an applicable effluent limitation or other limitation under sections 301(b) and 302 and for which there is not an applicable standard under sections 306 and 307, the certifying authority shall so certify, except that such a certification shall not satisfy section 511(c).
"(4) Review for compliance.--Notwithstanding subsection (a)(4)--
"(A) prior to the initial operation of any federally licensed or permitted facility or activity that may result in a point source discharge into the waters of the United States and with respect to which a certification has been obtained pursuant to this subsection, which facility or activity is not subject to a Federal operating license or permit, the licensee or permittee shall provide an opportunity for the certifying authority to review the manner in which the facility or activity shall be operated or conducted for the purposes of assuring that applicable effluent limitations or other limitations or other applicable water quality requirements will not be violated;
"(B) on notification by the certifying authority that the operation of any federally licensed or permitted facility or activity described in subparagraph (A) will violate applicable effluent limitations or other limitations or other water quality requirements, the applicable Federal agency may, after public hearing, suspend the Federal license or permit; and
"(C) if a Federal license or permit is suspended pursuant to subparagraph (B), the Federal license or permit shall remain suspended until notification is received from the certifying authority that there is reasonable assurance that the facility or activity will not violate the applicable provisions of sections 301, 302, 303, 306, and 307.
"(5) Limitation and monitoring requirements of certain linear infrastructure certifications.--Notwithstanding subsection (d)--
"(A) any certification provided under this subsection shall set forth any effluent limitations and other limitations and monitoring requirements necessary to assure that any point source discharge subject to this subsection will comply with the applicable provisions of sections 301, 302, 303, 306, and 307; and
"(B) any limitations and requirements set forth pursuant to subparagraph (A) shall be imposed by the licensing or permitting agency as a condition on any Federal license or permit subject to the provisions of this section.
"(6) Reasonable period of time.--Notwithstanding the periods of time in subsections (a)(1) and (e)(4), a licensing or permitting agency shall, categorically or on a case-by-case basis for each certification application, establish a reasonable period of time (not to exceed 9 months from the date of receipt of the certification application) within which a certifying authority shall issue a final action on the certification application under this subsection, which shall account for the time required under applicable State or Tribal law for public notice and comment periods.
"(h) Definitions.--In this section:
"(1) Certification application.--The term `certification application' means a request from an applicant for a certification described in subsection (a).
"(2) Certifying authority.--The term `certifying authority', with respect to a certification application, means, as applicable--
"(A) the State or interstate agency to which the certification application was submitted, including an Indian Tribe that is treated as a State for purposes of this section pursuant to section 131.8 of title 40, Code of Federal Regulations; or
"(B) if no State or interstate agency has the authority to provide the certification described in subsection (a), the Administrator.
"(3) Water quality requirements.--The term `water quality requirements' means--
"(A) the applicable provisions of sections 301, 302, 303, 306, and 307;
"(B) any Federal and State or Tribal laws (including regulations) implementing sections 301, 302, 303, 306, and 307 that are applicable to discharges into waters of the United States; and
"(C) any State or Tribal law that enhances, maintains, or protects public water supplies, propagation of fish and wildlife, navigation, or recreational, agricultural, industrial, or any other use of waters.".
______
SA 6900. Ms. BLUNT ROCHESTER (for herself, Ms. Alsobrooks, Ms. Duckworth, Mr. Merkley, Mr. Lujan, Mr. Blumenthal, Mr. Kim, and Mr. Kelly) submitted an amendment intended to be proposed to amendment SA 6883 proposed by Mr. Thune (for Mrs. Capito (for herself, Mr. Lee, Mr. Whitehouse, and Mr. Heinrich)) to the bill H.R. 2347, to amend the Internal Revenue Code of 1986 to exclude from gross income any damages, other than punitive damages, received on account of any sexual acts or sexual contact; which was ordered to lie on the table; as follows:
Text printed in the Record (101 characters)
On page 75, lines 2 and 3 of the amendment, strike ", without vacatur or issuance of an injunction,".